Drawworks
OIME 2000 HP drawworks, 42VC1200 high drum clutch and 38VC 1200 low
drum clutch, Driven by two (2) GE 752 type series wound DC traction motors
with 10 hp blowers. Complete with Wichita 336 water or glycol cooled
auxiliary brake.
Mast
DSI 150’ beam leg with 1,000,000 lb hook load capacity and mast assembly stand.
Crown Block - 1 x 60” fabricated steel fast line sheave and 6 x 60” working sheaves.
Sheaves grooved for 1-3/8” line. Geronimo line is 9/16” line 1.5 times derrick height in
length. Drill pipe capacity is 242 stands of 5” DP and 10 stands of 9” DC’s. One mast
assembly stand and two stands to elevate the blocks are included.
Deadline Anchor - 100,000 lb deadline anchor, Deadline is on off-driller’s side
Substructure
DSI 30' box-on-box with a casing capacity of 1,000,000 lbs and a setback capacity of
600,000 lbs., Includes a complete set of hand rails and wind walls 8’ high.
OIME 2000 HP drawworks, 42VC1200 high drum clutch and 38VC 1200 low
drum clutch, Driven by two (2) GE 752 type series wound DC traction motors
with 10 hp blowers. Complete with Wichita 336 water or glycol cooled
auxiliary brake.
Mast
DSI 150’ beam leg with 1,000,000 lb hook load capacity and mast assembly stand.
Crown Block - 1 x 60” fabricated steel fast line sheave and 6 x 60” working sheaves.
Sheaves grooved for 1-3/8” line. Geronimo line is 9/16” line 1.5 times derrick height in
length. Drill pipe capacity is 242 stands of 5” DP and 10 stands of 9” DC’s. One mast
assembly stand and two stands to elevate the blocks are included.
Deadline Anchor - 100,000 lb deadline anchor, Deadline is on off-driller’s side
Substructure
DSI 30' box-on-box with a casing capacity of 1,000,000 lbs and a setback capacity of
600,000 lbs., Includes a complete set of hand rails and wind walls 8’ high.
No comments:
Post a Comment